Maintenance Management
Every component with its due limit by hours, cycles or calendar — whichever comes first. The system counts down with each flight and warns you ahead of time.
-
100-hour inspection 22.4 h left
-
Propeller overhaul 310 h left
-
Transponder check 6 days left
-
Cabin fire extinguisher 4 months left
Maintenance tracking follows every flight
When a flight is completed in the logbook, its hours and landings go straight into maintenance tracking. There is no double entry: what was flown is already deducted from each item's due limit.
For each component you set the criteria — every so many hours, cycles or days, or a combination — and how far in advance you want to be warned. The system shows what is left, color-coded, and sends an email alert as the deadline approaches.

From alert to return to service
Maintenance no longer depends on someone's memory and follows a known path instead.
-
Step 1
Early alert
When an item enters the warning window, the team sees the alert on the dashboard and gets it by email.
-
Step 2
Scheduling
The maintenance is scheduled with a date and the items involved.
-
Step 3
Work order
The items become a work order, with parts, labor hours and costs.
-
Step 4
Completion
On completion, the next due limits are recalculated from the hours and cycles on the day the work was done.
-
Step 5
Return to service
The return to service is recorded and the aircraft is available to fly again.
This aircraft has an overdue item. Complete the maintenance to release new flights.
Illustrative screen with fictitious data
Overdue items never go unnoticed
Items you mark as critical block new flights from being logged while they are overdue.
- The pilot sees the reason right away, before heading out to the ramp.
- The aircraft is released as soon as the maintenance is completed, without relying on someone remembering to unlock it.
- Non-critical items only trigger an alert, without blocking the operation.
What stays under control
Everything with a deadline or a cost in the aircraft's maintenance, in one place.
Tracked items
Inspections, components with part and serial numbers (P/N and S/N), airworthiness directives and service bulletins.
Import your spreadsheet
Already have your maintenance tracking in a spreadsheet? The system reads the file and sets up the items for you to review.
Parts inventory
Parts and consumables in and out, with average cost.
Hangar
Hangar contracts and space occupancy.
Maintenance costs
How much each aircraft spent per period and the average time for each type of service.
Due-date report
What comes due first, by aircraft, ready to print.
Frequently asked questions
Can I track by hours and by date at the same time?
Yes. Each item accepts hours, cycles, days or a combination. Whichever comes due first applies.
Do I need to enter flight hours in maintenance tracking?
No. The hours and landings from each completed flight are added automatically.
Can the mechanic use the system?
Yes. They can have their own access to record work orders and complete maintenance, without seeing the financial side.
Can I bring over the tracking I already have?
Yes. The spreadsheet you use today can be imported; items are reviewed before they enter the system.
Next step
Want to see it working in your operation?
Tell us how your aircraft operates day to day. Our team will walk you through the system using your own case and answer your questions before you subscribe.