Service

Maintenance Management

Every component with its due limit by hours, cycles or calendar — whichever comes first. The system counts down with each flight and warns you ahead of time.

Tracked items
PR-DEMO
Airworthy
  • 100-hour inspection 22.4 h left
  • Propeller overhaul 310 h left
  • Transponder check 6 days left
  • Cabin fire extinguisher 4 months left
Illustrative screen with fictitious data

Maintenance tracking follows every flight

When a flight is completed in the logbook, its hours and landings go straight into maintenance tracking. There is no double entry: what was flown is already deducted from each item's due limit.

For each component you set the criteria — every so many hours, cycles or days, or a combination — and how far in advance you want to be warned. The system shows what is left, color-coded, and sends an email alert as the deadline approaches.

Aircraft cockpit with the instrument panel

From alert to return to service

Maintenance no longer depends on someone's memory and follows a known path instead.

  1. Step 1

    Early alert

    When an item enters the warning window, the team sees the alert on the dashboard and gets it by email.

  2. Step 2

    Scheduling

    The maintenance is scheduled with a date and the items involved.

  3. Step 3

    Work order

    The items become a work order, with parts, labor hours and costs.

  4. Step 4

    Completion

    On completion, the next due limits are recalculated from the hours and cycles on the day the work was done.

  5. Step 5

    Return to service

    The return to service is recorded and the aircraft is available to fly again.

PR-DEMO
Flight blocked

This aircraft has an overdue item. Complete the maintenance to release new flights.

ELT battery overdue by 9 days
Start flight

Illustrative screen with fictitious data

Overdue items never go unnoticed

Items you mark as critical block new flights from being logged while they are overdue.

  • The pilot sees the reason right away, before heading out to the ramp.
  • The aircraft is released as soon as the maintenance is completed, without relying on someone remembering to unlock it.
  • Non-critical items only trigger an alert, without blocking the operation.

What stays under control

Everything with a deadline or a cost in the aircraft's maintenance, in one place.

Tracked items

Inspections, components with part and serial numbers (P/N and S/N), airworthiness directives and service bulletins.

Import your spreadsheet

Already have your maintenance tracking in a spreadsheet? The system reads the file and sets up the items for you to review.

Parts inventory

Parts and consumables in and out, with average cost.

Hangar

Hangar contracts and space occupancy.

Maintenance costs

How much each aircraft spent per period and the average time for each type of service.

Due-date report

What comes due first, by aircraft, ready to print.

Frequently asked questions

Can I track by hours and by date at the same time?

Yes. Each item accepts hours, cycles, days or a combination. Whichever comes due first applies.

Do I need to enter flight hours in maintenance tracking?

No. The hours and landings from each completed flight are added automatically.

Can the mechanic use the system?

Yes. They can have their own access to record work orders and complete maintenance, without seeing the financial side.

Can I bring over the tracking I already have?

Yes. The spreadsheet you use today can be imported; items are reviewed before they enter the system.

Next step

Want to see it working in your operation?

Tell us how your aircraft operates day to day. Our team will walk you through the system using your own case and answer your questions before you subscribe.